Fourier-Int.com

PROJECT DETAILS

Project Scope: Engineering Design of Vacuum Distillation Unit
Project Title: EPCC of Vacuum Distillation Unit
End User: Al Saheel (HEWA Holding)
Plant Location: Hillah, Iraq
Project Duration: 8 Months
Summary: FIL was awarded the Engineering Design of the Vacuum Distillation Package. Project Scope included following;
Process Design including simulation, PFDs, PIDs, process datasheets, & specifications.
Piping Design including 3d modeling, isometrics, piping layouts, Material take offs, valve datasheets, and piping specifications.
Mechanical Design and drawings for vessels, heat exchangers, tanks and columns.
E&I Design including instrument datasheets & index, specifications, cable schedules and layouts, SCADA system design, & electrical load lists.
Structural calculations and drawings for pipe rack, VDU Package structure, VDU Column structure, storage & loading / unloading area piperacks and sleepers.
Civil Design including calculations and drawings for vessels, exchangers, pipe racks & sleepers, heater, VDU Column, VDU Package structure, heater and loading/unloading stations.

Project Scope: Engineering Design of Gathering Manifold Skid

Project Title: HKN SARSANG Block-Well Site Based Production Facility
End User: HKN Energy Ltd.
Plant Location: Kurdistan, Iraq
Project Duration: 16 weeks
Summary: Piping, Structural, & Instrumentation Design of Gathering Manifold Skid.
Scope included 3d modeling, stress analysis, GA drawings, isometrics, structural calculation and drawings, cable schedule and layouts.

 

Project Scope: Engineering Design of MEG Package
Project Title: Design & Supply of MEG Package
End User: Dubai Petroleum
Plant Location: UAE
Project Duration: 16 weeks
Summary:Mechanical, Structural, E&I, & Piping Design of MEG Package. Scope included mechanical design calculations and drawings, 3d modeling, GA drawings, isometrics, Stress analysis as per B31.3, & Structural design and drawings.

Project Scope: Mechanical Design of DNV Baskets
Project Title: Design & Supply of 10ton & 20ton DNV Baskets
End User: Technos
Plant Location: UAE
Project Duration: 5 weeks
Summary: Mechanical Design of SS & LTCS Progen Vessels. Scope included calculations as per ASME Sec VIII Div 1, GA, and fabrication drawings.

Project Scope: Stress Analysis of HP Steam Boiler and Turbine Piping
Project Title: 43MW Cogeneration Power Plant
End User: Hunza Steel Pvt Ltd.
Plant Location: Hunza, Pakistan
Project Duration: 4 weeks
Summary: Stress Analysis of High Pressure Steam Boiler and Turbine piping.
Scope included performing stress analysis as per B31.1, recommending changes in piping routing, support selection, spring support datasheets, stress isometrics, & final report.

Project Scope: Stress Analysis & Pipe Support Design
Project Title: 3000 m3/d Oily Water treatment Unit
End User: CNOOC MOC IDC TAPO (CMIT)
Plant Location: Iraq
Project Duration: 6 weeks
Summary:Stress Analysis of the skid and interconnecting piping including modifications required. Scope also included piping support selection and design.

 

Project Scope: Finite Element Analysis (FEA) of Permeater Housing
Project Title: G5 Permeater Housing
End User: Unconventional Gas Solutions (UGS)
Plant Location: UAE
Project Duration: 4 weeks
Summary: Finite Element Analysis of the permeater housing to optimize the design as per ASME Section VIII Div 1.

Project Scope: Mechanical Design of Double End Progen Vessels
Project Title: Design, Fabrication & Supply of Double End Progen Vessels
End User: Air Liquide
Plant Location: UAE
Project Duration: 5 weeks
Summary: Mechanical Design of SS & LTCS Progen Vessels. Scope included calculations as per ASME Sec VIII Div 1, GA, and fabrication drawings.

 
 

Need Help With Easier Industrial Solutions?