Refining - Equipment Supply

Fast-Track Design & Supply of Air Coolers

Iraq
2023

Project Scope

Design, Fabrication & Supply

Project Overview

Fast-track design, fabrication and supply of refinery air coolers in Iraq. The scope covers mechanical and structural calculations, fabrication drawings, in-house manufacturing, assembly and quality control, with factory acceptance testing included in the delivery package.

Key Highlights

  • Complete mechanical and structural design calculations
  • Detailed fabrication drawings and specifications
  • In-house fabrication of air coolers
  • Final assembly and quality control
  • Factory Acceptance Test (FAT) successfully completed

Project Gallery

Project Statistics

Project Duration
10 Weeks
Location
Iraq
Scope
Design + Fabrication + Supply
Testing
FAT Included

Have a Similar Project in Mind?

Let's discuss how our proven expertise can deliver exceptional results for your next venture