Refining - Process Units

Engineering Design of 70,000 BPD CDU + LPG Unit

Iraq
2024

Project Scope

Complete Engineering Design

Project Overview

Complete engineering design for a 70,000 BPD crude distillation unit with integrated LPG recovery in Iraq. The scope combines basic and detailed engineering across process, piping, mechanical, electrical, instrumentation, structural and civil disciplines, with Aspen HYSYS simulation, heat and material balances, P&IDs, equipment specifications and 3D piping stress analysis.

Key Highlights

  • Basic and detailed engineering for a 70,000 BPD CDU with integrated LPG recovery.
  • Aspen HYSYS process simulation and heat and material balances.
  • P&ID development and equipment specifications for the fired heater, columns, exchangers, air coolers, pumps and drums.
  • 3D piping modelling, layouts and comprehensive stress analysis.
  • Electrical and instrumentation design with SCADA integration.
  • Structural and civil engineering for equipment and supporting structures.
  • Engineering coordination for pipe rack modules and equipment skid interfaces.

Project Gallery

Project Statistics

Capacity
70,000 BPD
Project Duration
8 Months
Location
Iraq
Units
CDU + LPG