PROJECT DETAILS
Project Scope: Engineering Design of Vacuum Distillation Unit
Project Title: EPCC of Vacuum Distillation Unit
End User: Al Saheel (HEWA Holding)
Plant Location: Hillah, Iraq
Project Duration: 8 Months
Summary: FIL was awarded the Engineering Design of the Vacuum Distillation Package. Project Scope included following;
Process Design including simulation, PFDs, PIDs, process datasheets, & specifications.
Piping Design including 3d modeling, isometrics, piping layouts, Material take offs, valve datasheets, and piping specifications.
Mechanical Design and drawings for vessels, heat exchangers, tanks and columns.
E&I Design including instrument datasheets & index, specifications, cable schedules and layouts, SCADA system design, & electrical load lists.
Structural calculations and drawings for pipe rack, VDU Package structure, VDU Column structure, storage & loading / unloading area piperacks and sleepers.
Civil Design including calculations and drawings for vessels, exchangers, pipe racks & sleepers, heater, VDU Column, VDU Package structure, heater and loading/unloading stations.
![Screenshot 2022-12-28 235746](https://fourier-int.com/wp-content/uploads/2023/12/Screenshot-2022-12-28-235746.png)
![72fc2031-f580-4cf0-98cc-62279bea6d0e](https://fourier-int.com/wp-content/uploads/2023/12/72fc2031-f580-4cf0-98cc-62279bea6d0e.jpg)
![65bc215d-442d-4d22-9963-0188ec5ef5b3](https://fourier-int.com/wp-content/uploads/2023/12/65bc215d-442d-4d22-9963-0188ec5ef5b3.jpg)
![6ff38fe8-b470-4128-83bb-dcc430e00af3](https://fourier-int.com/wp-content/uploads/2023/12/6ff38fe8-b470-4128-83bb-dcc430e00af3.jpg)
![Vdu](https://fourier-int.com/wp-content/uploads/2023/12/Vdu.png)
![Screenshot 2022-12-28 224540](https://fourier-int.com/wp-content/uploads/2023/12/Screenshot-2022-12-28-224540.png)
![dc90ad06-1432-45df-9981-cded1369420b](https://fourier-int.com/wp-content/uploads/2023/12/dc90ad06-1432-45df-9981-cded1369420b.jpg)
![Capture](https://fourier-int.com/wp-content/uploads/2023/12/Capture.jpg)
![c4556b8c-cc1c-4874-bec1-4f82ca507210](https://fourier-int.com/wp-content/uploads/2023/12/c4556b8c-cc1c-4874-bec1-4f82ca507210.jpg)
![ad5aac4d-466e-478c-b1dd-12482f7feb3e](https://fourier-int.com/wp-content/uploads/2023/12/ad5aac4d-466e-478c-b1dd-12482f7feb3e.jpg)
![144da1f8-8a61-4c40-932c-b17b3d4e89d9](https://fourier-int.com/wp-content/uploads/2023/12/144da1f8-8a61-4c40-932c-b17b3d4e89d9.jpg)
![0d6a7c11-6add-408d-ae3b-aefdbc46454c](https://fourier-int.com/wp-content/uploads/2023/12/0d6a7c11-6add-408d-ae3b-aefdbc46454c.jpg)
![0ebe3ea5-461d-453f-a395-df3dea52255a](https://fourier-int.com/wp-content/uploads/2023/12/0ebe3ea5-461d-453f-a395-df3dea52255a.jpg)
![0fadd225-90d9-4cc0-be92-67f3d565ac39](https://fourier-int.com/wp-content/uploads/2023/12/0fadd225-90d9-4cc0-be92-67f3d565ac39.jpg)
![2](https://fourier-int.com/wp-content/uploads/2023/12/2.jpg)
Project Scope: Engineering Design of Gathering Manifold Skid
Project Title: HKN SARSANG Block-Well Site Based Production Facility
End User: HKN Energy Ltd.
Plant Location: Kurdistan, Iraq
Project Duration: 16 weeks
Summary: Piping, Structural, & Instrumentation Design of Gathering Manifold Skid.
Scope included 3d modeling, stress analysis, GA drawings, isometrics, structural calculation and drawings, cable schedule and layouts.
![6](https://fourier-int.com/wp-content/uploads/2023/12/6-2.jpg)
![IMG-20221208-WA0003](https://fourier-int.com/wp-content/uploads/2023/12/IMG-20221208-WA0003-2.jpg)
![IMG-20221208-WA0004](https://fourier-int.com/wp-content/uploads/2023/12/IMG-20221208-WA0004-2.jpg)
![IMG-20221208-WA0006](https://fourier-int.com/wp-content/uploads/2023/12/IMG-20221208-WA0006-2.jpg)
![IMG-20221208-WA0007](https://fourier-int.com/wp-content/uploads/2023/12/IMG-20221208-WA0007-2.jpg)
![SHENGG-1131-SM-GA-006 REV-4 GAD for Manifold Package_1](https://fourier-int.com/wp-content/uploads/2023/12/SHENGG-1131-SM-GA-006-REV-4-GAD-for-Manifold-Package_1-2-scaled.jpg)
![1](https://fourier-int.com/wp-content/uploads/2023/12/1-5.jpg)
![3D Model](https://fourier-int.com/wp-content/uploads/2023/12/3D-Model-2.jpg)
Project Scope: Engineering Design of MEG Package
Project Title: Design & Supply of MEG Package
End User: Dubai Petroleum
Plant Location: UAE
Project Duration: 16 weeks
Summary:Mechanical, Structural, E&I, & Piping Design of MEG Package. Scope included mechanical design calculations and drawings, 3d modeling, GA drawings, isometrics, Stress analysis as per B31.3, & Structural design and drawings.
![29689e9d-906d-4694-97cd-3e4328adc31b](https://fourier-int.com/wp-content/uploads/2023/12/29689e9d-906d-4694-97cd-3e4328adc31b-1.jpg)
![1a7a5d58-7e36-426e-b94d-71a296d9123f](https://fourier-int.com/wp-content/uploads/2023/12/1a7a5d58-7e36-426e-b94d-71a296d9123f-1.jpg)
Project Scope: Mechanical Design of DNV Baskets
Project Title: Design & Supply of 10ton & 20ton DNV Baskets
End User: Technos
Plant Location: UAE
Project Duration: 5 weeks
Summary: Mechanical Design of SS & LTCS Progen Vessels. Scope included calculations as per ASME Sec VIII Div 1, GA, and fabrication drawings.
![1](https://fourier-int.com/wp-content/uploads/2023/12/1-3.jpg)
Project Scope: Stress Analysis of HP Steam Boiler and Turbine Piping
Project Title: 43MW Cogeneration Power Plant
End User: Hunza Steel Pvt Ltd.
Plant Location: Hunza, Pakistan
Project Duration: 4 weeks
Summary: Stress Analysis of High Pressure Steam Boiler and Turbine piping.
Scope included performing stress analysis as per B31.1, recommending changes in piping routing, support selection, spring support datasheets, stress isometrics, & final report.
![HP Line (As Per Site)1_1](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_1-1.jpg)
![HP Line (As Per Site)1_2](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_2-1.jpg)
![HP Line (As Per Site)1_4](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_4-1.jpg)
![HP Line (As Per Site)1_5](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_5-1.jpg)
![HP Line (As Per Site)1_6](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_6-1.jpg)
![HP Line (As Per Site)1_7](https://fourier-int.com/wp-content/uploads/2023/12/HP-Line-As-Per-Site1_7-1.jpg)
![WhatsApp Image 2022-12-29 at 00.13.17](https://fourier-int.com/wp-content/uploads/2023/12/WhatsApp-Image-2022-12-29-at-00.13.17-1.jpg)
Project Scope: Stress Analysis & Pipe Support Design
Project Title: 3000 m3/d Oily Water treatment Unit
End User: CNOOC MOC IDC TAPO (CMIT)
Plant Location: Iraq
Project Duration: 6 weeks
Summary:Stress Analysis of the skid and interconnecting piping including modifications required. Scope also included piping support selection and design.
![1520089808132](https://fourier-int.com/wp-content/uploads/2023/12/1520089808132-1.jpeg)
![IMG_24022017_094439_0](https://fourier-int.com/wp-content/uploads/2023/12/IMG_24022017_094439_0-1.png)
![IMG_24022017_094529_0](https://fourier-int.com/wp-content/uploads/2023/12/IMG_24022017_094529_0-1.png)
![Piping](https://fourier-int.com/wp-content/uploads/2023/12/Piping-4-scaled.jpg)
Project Scope: Finite Element Analysis (FEA) of Permeater Housing
Project Title: G5 Permeater Housing
End User: Unconventional Gas Solutions (UGS)
Plant Location: UAE
Project Duration: 4 weeks
Summary: Finite Element Analysis of the permeater housing to optimize the design as per ASME Section VIII Div 1.
![3](https://fourier-int.com/wp-content/uploads/2023/12/3.jpg)
![4](https://fourier-int.com/wp-content/uploads/2023/12/4.jpg)
![1](https://fourier-int.com/wp-content/uploads/2023/12/1-4.jpg)
![2](https://fourier-int.com/wp-content/uploads/2023/12/2-1.jpg)
Project Scope: Mechanical Design of Double End Progen Vessels
Project Title: Design, Fabrication & Supply of Double End Progen Vessels
End User: Air Liquide
Plant Location: UAE
Project Duration: 5 weeks
Summary: Mechanical Design of SS & LTCS Progen Vessels. Scope included calculations as per ASME Sec VIII Div 1, GA, and fabrication drawings.
![1](https://fourier-int.com/wp-content/uploads/2023/12/1-1.png)